Back to home

Predictive maintenance for heavy equipment

A rising temperature or a change in vibration can give your team time to investigate. Talpeye helps assess those warnings and plan the repair, including the parts, technician and time the job needs.

Industrial OSThe platform

Example repair

Equipment condition review

A sensor trend moves away from the asset’s recent operating baseline.

Evidence
Readings and operating context
Alert
Uncertainty in view
Action
Investigation before approval
Suggested next step

Investigate the supporting signals and uncertainty before proposing an intervention and maintenance window.

How it works

01

Check the readings you have

Choose the equipment and faults you want to study. Check how often readings arrive, what is missing and how the machine was running. Some faults cannot be detected from the available sensors.

02

Judge the warning

Compare the alert with recent readings and normal operating conditions. Track missed faults, false alerts and how long warnings last to see whether they help your team decide.

03

Plan the repair

Use the findings to decide what to inspect or repair. Check parts, technician availability and production time before approving the job. Keep the uncertainty in the data visible during that decision.

What we need to get started.

Sensor history

Time-stamped readings, channel definitions, units, sampling intervals and known gaps.

Asset context

Operating modes, utilisation, component details and maintenance events.

Evaluation records

Confirmed failure events, healthy operating periods and the actions taken in response to alerts.

What to measure in a pilot.

We checked our alerts against historical data. A pilot needs to check missed failures, warning times and false alerts in your operation, then test whether the team can act on them. The links below describe the datasets used in the research.

  • Failure events detected and missed
  • Warning time and alert persistence
  • False alerts and investigation workload

Common questions.

Does predictive maintenance guarantee a failure date?

No. An alert flags a possible fault based on the readings available. Your team needs to check it against how the machine is being used. Warning times measured in a study will not be the same for every machine.

What should we measure in a pilot?

Agree what counts as a failure and how long the test will run. Count missed faults and false alerts as well as correct warnings. Record how much time the team spends investigating and what happens after each warning.

Can testing alerts on historical data prove downtime savings?

Historical data can show whether alerts matched recorded failures. To measure downtime savings, you need to compare actual repairs and production stops with the way the site worked before the pilot.

Show us how you work today.

Tell us what equipment you run and where maintenance gets held up. We’ll show you how Talpeye could help and what a pilot would involve.

Book a walkthrough